Paint your Wagon!
Paint your Wagon !
Team UK recently organised the delivery and offloading of a rail wagon that travelled all the way from Brazil. The team safely delivered the unit to the factory and discharged the wagon from the truck with two mobile cranes onto specially laid track sections, after which we could winch it safely into the workshop to begin the work. The operation went very smooth and the client was very happy with the service provided.
The wagon will be refurbished and fitted with specialist surveying equipment enabling it to identify even the smallest cracks in a rail section and report the location back to a central operating base for repair. The unit will be in the UK for 6 months before returning home ready to commence work.
We would like to thank all involved for making this a successful operation !