Kick-off for Alabama
The preparation took months, but the first shipment for the expansion of a refining facility in Alabama is safely on the way. In the run up to the project, it was decided to do the final assembly of the units in the port and then move them by flattop barge to alongside the seagoing vessel for loading. The operation was executed smoothly under the direction of our port captains and promises to be a good start of the project.